The other half of the Celtic Freeport. Swansea's enterprise park, the Baglan and Port Talbot industrial belt, the marina, and a supply chain that is being asked for its DSEAR paperwork more often every year.
Swansea Bay carries some of the densest industry in Wales: the steelworks supply chain in Port Talbot, the energy and chemicals cluster at Baglan, Swansea Enterprise Park's engineering and distribution units, the docks and marina, and a university spin-out sector working with hydrogen and batteries. Principal contractors and operators here audit their suppliers hard, and the DSEAR assessment is one of the first documents asked for at pre-qualification. With the Celtic Freeport linking Port Talbot and Milford Haven, the same tier-one contractors work both ends of the M4 and expect the same paperwork at each.
Swansea and Port Talbot are roughly ninety minutes from our Milford Haven base. Travel is built into the fixed quote and is usually absorbed when two or more sites are visited on the same day; contractors with a yard in Port Talbot and another in the Haven are quoted as one job. Where the assessment is needed for a tender, say so — see DSEAR for pre-qualification and tenders.
Nearly every DSEAR site also needs a fire risk assessment recorded in full, and PQQs ask for both. We do both, written to agree with each other, in one visit. For kitchens and hospitality on Swansea Bay the extract cleaning question also comes up; that is a different trade, but the fire risk assessment will flag it.
Nearby: Carmarthenshire and Llanelli · Pembrokeshire · What an inspector asks for
Yes. Both are within a morning's drive of Milford Haven and travel is built into the fixed quote. Contractors working the Celtic Freeport at both ends are often assessed as one job.
A single-yard contractor assessment is a half-day visit and a five-working-day report, faster where the start date is fixed. Ring with the deadline.
Yes, within scope. New installations must be assessed before work with the dangerous substance starts; see new plant and installations. Complex process plant is scoped honestly on the call and declined if it is outside our competence.
No charge for the conversation. Most quotes go out the same day.