Pricing

What a DSEAR assessment costs

Fixed price, quoted before the visit. No day rates that creep.

Assessed by Andrew Rogers CertIOSH, MIFSM, SIRM · Vulcan Risk ManagementNVQ Level 6 Occupational Health & SafetyNEBOSH National General CertificateNEBOSH Certificate in Fire SafetyLevel 3 DSEAR qualification

A DSEAR assessment starts from £400 for a straightforward site with a single hazardous area, from £650 where there are several hazardous areas or hazards, and from £1,000 for larger or more complex sites. Those are guide prices: the final figure depends on the areas, substances and processes involved and how much zoning is needed, and it is quoted as a fixed sum after a short scoping call, before anyone visits.

Guide prices

Straightforward assessment, single hazardous areafrom £400
Multiple hazardous areas or hazardsfrom £650
Larger or more complex DSEAR assessmentsfrom £1,000

These are guide prices. The final cost depends on the number of hazardous areas, the substances and processes involved and the extent of any hazardous area classification or zoning required. The figure quoted after the scoping call is then fixed.

Fixed price, quoted up front

Every DSEAR assessment is quoted as a fixed figure after a short scoping call, before anyone visits. If the site turns out to be smaller than described, the price comes down. It does not go up.

What drives the number

How our prices compare with other UK consultancies

Other UK DSEAR consultancies commonly publish ranges in the low to high four figures. Our guide prices start well below that, and every job is still quoted as a fixed figure after the scoping call, so the number you get is yours and does not move.

ScopeTypical UK published rangeOur guide priceWhat it usually is
One or two hazardous areas, no process plantLow four figuresfrom £400A workshop with gas cylinders and a paint store; a park with a bulk LPG tank; a garage; a small brewery
Several areas across a site, zoning drawings neededMid four figuresfrom £650A contractor yard with stores, fuel and a spray booth; a forecourt with LPG; a food plant with dust and CO2
Larger or complex sites, including process plantHigh four to five figuresfrom £1,000AD plant, distillery, chemical blending, multi-building manufacturing

Two things move a site down the table: existing layout drawings, and an empty or quiet site to work in. Two things move it up: process plant, and a live 24-hour operation. Travel inside Pembrokeshire is never a factor. The scoping call tells you which row you are in before anyone visits.

What it costs to not have one

Health and safety offences in the Crown Court carry unlimited fines, and sentencing is scaled to turnover. That is before you count the shutdown, the insurance position and the contract you lose because a client asked for your DSEAR assessment and you did not have one.

Increasingly it is the last one that gets people to pick up the phone. Tier-one contractors on the big energy sites now ask for it at pre-qualification.

Pricing questions

How much does a DSEAR risk assessment cost?

Guide prices start from £400 for a straightforward assessment with a single hazardous area, from £650 for multiple hazardous areas or hazards, and from £1,000 for larger or more complex sites. The final cost depends on the substances, processes and the extent of zoning required, and it is quoted as a fixed figure after a ten-minute scoping call, before any visit.

Do you charge for travel?

Travel within Wales and the South West is included. Further afield we add it at cost and tell you the figure up front. There are no surprise line items.

Is the zoning drawing extra?

No. Where hazardous area classification is needed, it is part of the assessment. If you only want zoning drawings for an area already assessed, that is quoted separately.

What makes a quote go up?

Multiple buildings, multiple separate release sources, a site with no existing drawings, or process plant that needs a basis of safety review. Night or weekend access on a live site also moves it.

Tell us what you store and we'll tell you where you stand

No charge for the conversation. Most quotes go out the same day.

Page last reviewed and updated: . Assessments by Andrew Rogers, Vulcan Risk Management Ltd.