A worked example

What a DSEAR assessment actually looks like

The document, section by section, so you know what you are buying before you buy it.

Assessed by Andrew Rogers CertIOSH, MIFSM, SIRM · Vulcan Risk ManagementNVQ Level 6 Occupational Health & SafetyNEBOSH National General CertificateNEBOSH Certificate in Fire SafetyLevel 3 DSEAR qualification

The sections

01

Scope and site description

What is covered, what is not, and who the operator is. Also what was not accessible on the day, which matters if it comes up later.

02

Inventory of dangerous substances

Every substance, quantity, where it is held and in what. Taken from what is actually on site rather than from what the purchasing list says.

03

Release sources

Each point where a flammable atmosphere can be released, graded continuous, primary or secondary. This is the part the zoning is built from and it is the part most often skipped.

04

Ventilation assessment

Natural or mechanical, its availability and its effectiveness. Ventilation is what turns a release into a zone of a particular size.

05

Hazardous area classification

The zones, with a drawing and dimensions. Zone 0, 1 and 2 for gases and vapours; 20, 21 and 22 for dusts. Where the assessment finds no zones are needed, the reasoning is recorded instead.

06

Ignition source review

Electrical and non-electrical, including the ones people forget: hot surfaces, static, mechanical sparks and mobile phones.

07

Existing control measures

What you already have and whether it is doing what you think it is doing.

08

Action list

Numbered, prioritised and dated. Legally necessary items separated from good practice.

What you should be able to do with it

If a document cannot do those five things, it has not earned its fee whatever it cost.

What we will not put in it

We do not pad assessments with regulation text you can read yourself, and we do not zone an entire building because it is quicker than working out where the release sources are. Over-zoning is not the safe option: it makes the document useless, it forces unnecessary equipment spending, and it teaches everyone on site to ignore the drawing.

Questions

How long is a DSEAR assessment?

For a single-substance site such as a small workshop with a solvent store, often twenty to thirty pages including the drawings. A multi-process site runs longer. Length is not the measure: a short assessment that identifies every release source is worth more than a long one that repeats the regulations back at you.

Do I get a drawing?

Yes. A zoning drawing with dimensions is the part an inspector, an installer and your insurer will all want, and it is the part most commonly missing from assessments people bring us.

Can you use our existing risk assessment format?

Usually. What matters is that the required elements are there and findable, not the house style. If your business already has a format that people actually read, that is worth keeping.

What if the assessment says we need to spend money?

It should tell you what is legally necessary, what is good practice, and what is optional, and rank the actions by urgency. If everything is urgent, nothing is, and you cannot plan around it.

Do you sell the equipment as well?

No. We write the assessment and you buy whatever it says you need from whoever you like. There is no incentive for us to find a problem that needs an expensive product.

Related

What is a DSEAR assessment?

The duty, in plain terms.

What it costs

What moves the price, and what does not.

Hazardous area classification

The drawing, and how the zones are worked out.

Tell us what you store and we'll tell you where you stand

No charge for the conversation. Most quotes go out the same day.

Page last reviewed and updated: . Assessments by Andrew Rogers, Vulcan Risk Management Ltd.